Article citation information:
Łukasik,
Z., Kuśmińska-Fijałkowska, A., Olszańska, S. Strategy
for the implementation of transport processes toward improving services. Scientific Journal of Silesian University of
Technology. Series Transport. 2023, 118,
173-193. ISSN: 0209-3324. DOI: https://doi.org/10.20858/sjsutst.2023.118.12.
Zbigniew
ŁUKASIK[1], Aldona
KUŚMIŃSKA-FIJAŁKOWSKA[2], Sylwia OLSZAŃSKA[3]
STRATEGY FOR THE IMPLEMENTATION OF TRANSPORT PROCESSES TOWARD IMPROVING
SERVICES
Summary. The current
situation in the commodities market has forced suppliers to change their ways
of satisfying customer needs. The supply chain aims to deliver raw materials,
semi-finished products and finished products to the right place at the right
time, incurring the lowest costs. Therefore, high-quality transport services
have become indispensable in competing with other entities, enterprises are
guided by the timeliness of deliveries in the Just-in-Time and Door-to-Door
systems, and the costs incurred. Hence, to ensure that the pursued actions are
implemented effectively, it is imperative to apply a process strategy
comprising a characteristic component of the transport process management that
would have a significant impact on the improvement of the services provided. In
this paper, the authors conducted research on a real object of cargo transport
on fixed routes and established a concept of streamlining the transport
processes carried out at a company. The improvement concept proposed by the
authors permits the minimization of the time of loading operations on
routes related to a specific load. The result is a reduced total time of cargo
transport, which offers the possibility of taking more orders at the studied
company.
Keywords: shipping
process, service quality, transport order, transport fleet
1. INTRODUCTION
Dynamic economic development has had a
substantial impact on transport, which has formed the basis of a thriving
enterprise in the goods and services market. To avoid
excessive costs and save time, companies without their own rolling stock began
using the services of other specialized companies [1, 4, 6, 7]. Partnering with new business partners led to the creation
of a supply chain in which transport plays a key role [20]. Transport companies are entities that condition the
correct flow of goods from suppliers to recipients [11]. Delays that occur during cargo transport adversely affect
the entire supply chain. Thus, an important issue is the analysis of
the implemented routes to improve the transport process and prevent undesirable
situations that impede transport
[2, 10, 13, 15]. Since the transport service
market creates a huge scale of competition, entrepreneurs seek to achieve an
advantage in terms of modernity, speed, and the quality of services provided
[3, 8-9, 14].
The concept of supply chain
management as a management strategy is based on cooperation centered on linking
business operations between enterprises to achieve a common vision of market
opportunities [17,
19, 22]. Therefore, running a transport company is
associated with the management of key processes, which include fleet management
and transport processes [24-25]. Therefore,
management of the transport process should be regarded as a sequence of mutual
interactions that transform the input state into the initial state,
implementing the plan of delivering goods to the customer in line with the
Just-in-Time and Door-to-Door principle [12, 16, 23].
This article analyzed the number of services
provided by regular and other business partners as well as the number of orders
carried out with their own fleet and through forwarding at a company in the
years 2019-2020. A comparative analysis
of transport processes carried out on fixed routes in the examined enterprise
was carried out. Based on the analysis, the authors
posited a concept of improving the transport processes by reducing the times of
loading operations. The improvement was carried out
using operational parameters indicators: transport time, operational speed, and
vehicle performance.
2. CHARACTERIZATION OF
THE TRANSPORT COMPANY STUDIED
The investigated company provides
services in the transport of goods by road in Poland. The transported load
consists of building materials and furniture boards. In 2017, the company
purchased its first truck tractor unit. The turn of
2018-2019 was a crucial time due to the long-standing cooperation with
companies that became their main customers, contributing to the expansion of
the carrier’s fleet by another 2 sets of tractor units with trailers in
2019 (Figure 1).
Fig. 1. Development of rolling stock
at the turn of 2017-2020 at the enterprise
The company’s fleet includes
only Scania tractor units with mega curtain trailers. The specification of mega
semi-trailers is as follows: length of 13.61 m, a width of 2.48 m, a lowered
structure and smaller wheels. As a result, the cargo
space can be increased up to 3 m while maintaining the requirement not to
exceed the maximum vehicle height of 4 m. The sides
are covered with a curtain, allowing for quick loading and unloading from the
side, back and top due to the use of a raised roof. The
height of the loading space can be adjusted in the range of 2.9 - 3 m, for
example, to match the load to the vehicle [21] (Figure 2).
Fig. 2. Cross-section of a mega
curtain semi-trailer [21]
Fig. 3. Organization of the
transport process at the enterprise
Based on the analysis of the company, the business partners with whom
cooperation was usually undertaken for the total number of completed orders
were indicated. In 2018, the most frequent cooperation took place with
contractors no. 3 and 4, which accounted for 54.3% and 19.8%, respectively, of
all orders. The remaining 25.9% of executed orders were from other contractors
who were not regular customers of the analyzed carrier. In
2019, there was an increase in the total number of transport services provided
by 349, representing an increase in the number of services delivered by 177%. The
recorded progress stemmed from the development of the carrier’s rolling
stock and the cooperation established with contractor no. 2, for whom 187
transport services were implemented yearly, amounting to 34.2% of all orders. In 2019, contractor no. 3 was provided 159 services, which
accounted for 29.1% of all orders. Comparing 2020
to 2019, there was an increase in the number of services provided by 176% (416
more completed orders compared to the previous year). Contractors no. 1 and 2 represent 54.3% of all orders in
2020 at a level of 523 services provided (Figure 4).
Fig. 4. Business partners of the company at the turn of
2018-2020 [18]
Based on the
analysis and the adopted growth rate of the number of services provided at the
level of 176%, an increase in the number of completed orders by 2023 was
forecast. In effect, the most favorable variant of the
company’s development was presented, assuming no disruptions in the
execution of orders related to the technical aspects of the carrier’s
rolling stock, staffing problems and external factors, for example, changes in
legal regulations or epidemiological situation (Figure 5).
Fig. 5. Forecast growth in the number of
services provided until 2023
at the enterprise
3. ANALYSIS OF TRANSPORT
PROCESSES CARRIED OUT AT THE ENTERPRISE
Tab. 1
Source data of the services provided in
2019-2020 at the enterprise.
|
YEAR 2019 |
|||||||
Month |
Number of services
provided to regular contractors |
Number of services
provided to other contractors |
Total |
Structure of the
share of regular contractors in all services provided [%] |
Number of services
provided by own fleet |
Number of
forwarding services provided |
Structure of the
number of services provided by own fleet [%] |
Structure of the
number of services provided by forwarding [%] |
January |
6 |
10 |
16 |
38 |
16 |
0 |
100 |
0 |
February |
6 |
9 |
15 |
40 |
15 |
0 |
100 |
0 |
March |
32 |
5 |
37 |
86 |
37 |
0 |
100 |
0 |
April |
32 |
10 |
42 |
76 |
42 |
0 |
100 |
0 |
May |
34 |
15 |
49 |
69 |
36 |
13 |
73 |
27 |
June |
23 |
35 |
58 |
40 |
49 |
9 |
84 |
16 |
July |
41 |
31 |
72 |
57 |
65 |
7 |
90 |
10 |
August |
37 |
20 |
57 |
65 |
57 |
0 |
100 |
0 |
September |
38 |
17 |
55 |
69 |
55 |
0 |
100 |
0 |
October |
39 |
21 |
60 |
65 |
60 |
0 |
100 |
0 |
November |
28 |
23 |
51 |
55 |
51 |
0 |
100 |
0 |
December |
29 |
5 |
34 |
85 |
34 |
0 |
100 |
0 |
|
YEAR 2020 |
|||||||
Month |
Number of services provided to regular contractors |
Number of services provided to other contractors |
Total |
Structure of the share of regular contractors in all services provided
[%] |
Number of services provided by own fleet |
Number of forwarding services provided |
Structure of the number of services provided by own fleet [%] |
Structure of the number of services provided by forwarding [%] |
January |
44 |
18 |
62 |
71 |
62 |
0 |
100 |
0 |
February |
43 |
29 |
72 |
60 |
71 |
1 |
99 |
1 |
March |
35 |
37 |
72 |
49 |
72 |
0 |
100 |
0 |
April |
19 |
50 |
69 |
28 |
69 |
0 |
100 |
0 |
May |
33 |
37 |
70 |
47 |
70 |
0 |
100 |
0 |
June |
43 |
38 |
81 |
53 |
81 |
0 |
100 |
0 |
July |
127 |
47 |
174 |
73 |
164 |
10 |
94 |
6 |
August |
90 |
24 |
114 |
79 |
101 |
13 |
89 |
11 |
September |
23 |
38 |
61 |
38 |
42 |
19 |
69 |
31 |
October |
26 |
45 |
71 |
37 |
46 |
25 |
65 |
35 |
November |
22 |
39 |
61 |
36 |
44 |
17 |
72 |
28 |
December |
18 |
37 |
55 |
33 |
45 |
10 |
82 |
18 |
In 2019, there
was an upward trend in the number of services provided throughout the months,
as a result of which 546 orders were completed during the year, and of these,
517 were carried out by the company’s own fleet. Throughout the
months, an average of 46 transport orders were carried out. At the turn of January and April, a
significant increase of 15 to 42 orders was recorded. In February, the impact of
establishing cooperation with regular business partners became visible,
constituting 86% of the services provided. From May to
July 2019, the provision of forwarding services recorded 5.3% of the annual
number of fulfilled orders. From August to November, the company only used
its own fleet and oscillated around 60 orders per month. In December, there was
a decrease to 34 services rendered, of which 85% involved regular contractors.
In 2020, the number of performed services equaled 962. Compared to the previous
year, the increase was 176%, which proves the carrier’s rapid
development. An increase in the average number of services performed during the
month by 34 orders was also evident, which entailed a 174% improvement. The year 2020 recorded 95 forwarding services,
representing 9.9% of all completed orders, that is, an increase of 4.6%.
The following routes were the
subject of the analysis:
- route no. 1: Stare Żukowice - Pustków Osiedle -
Wrocław - Oleśnica - Tarnów - Stare Żukowice,
- route no. 2: Stare
Żukowice – Tarnów – Sucha Górna – Lubin
– Dębica – Stare Żukowice,
- route no. 3: Stare
Żukowice – Dębica – Kłodnica – Tarnów
– Stare Żukowice.
As a result of the analysis of
routes no. 1, 2 and 3 in 2019-2020, Tables 2-7 were prepared, including the
route number, distinguished sections on the route, the date, time and place of
departure and arrival, section distance, load weight, travel time and pause on
the route, time of loading operations and total fuel consumption on the route
section. Based on the source data, the following values were calculated:
minimum, maximum, average and the sum of distances, driving time, pauses on
sections, loading activities, total work, and total fuel consumption.
In 2019, route no. 1, totaling 860
km, was covered in 14 h 30 min. The total transport
time included: driving – 11 h 05 min, pause while driving 1 h 35 min,
loading 1 h 35 min, unloading 1 h 50 min. The route was completed within
two working days. During the first day, 3 sections with
a total length of 475 km were covered in 9 h 30 min. On the second
day, the remaining 2 sections with a length of 385 km were driven within 6 h 35
min. During transport, the total fuel consumption was 260.4l,
and the average consumption on the route section was 52.1l (Table 2).
Tab. 2
Source data for route no. 1 in 2019
ROUTE: STARE
ŻUKOWICE - PUSTKÓW OSIEDLE - WROCŁAW - OLEŚNICA -
TARNÓW - STARE ŻUKOWICE |
||||||||||||||||||||||
Route number |
Section |
Route of section |
Place of departure |
Date of departure |
Hour of departure |
Distance [km] |
Weight of load |
Driving time [h] |
Pause time |
Place of arrival |
Hour of arrival |
Time of |
Time of unloading |
Total working |
End of work |
Total fuel |
||||||
1 |
1 |
Stare Żukowice- |
Stare |
01.03.2019 |
06:00 |
45 |
- |
00:40 |
- |
Pustków
Osiedle |
06:40 |
00:50 |
- |
01:30 |
- |
9,3 |
||||||
2 |
Pustków
Osiedle-Wrocław |
Pustków
Osiedle |
01.03.2019 |
07:30 |
400 |
20 |
05:00 |
00:50 |
Wrocław |
13:20 |
- |
01:00 |
06:00 |
- |
125 |
|||||||
3 |
Wrocław- |
Wrocław |
01.03.2019 |
14:20 |
30 |
- |
00:25 |
- |
Oleśnica |
14:45 |
00:45 |
- |
01:10 |
15:30 |
7 |
|||||||
4 |
Oleśnica-Tarnów |
Oleśnica |
02.03.2019 |
06:00 |
370 |
24 |
04:40 |
00:45 |
Tarnów |
11:25 |
- |
00:50 |
05:30 |
- |
115,6 |
|||||||
5 |
Tarnów- |
Tarnów |
02.03.2019 |
12:15 |
15 |
- |
00:20 |
- |
Stare |
12:35 |
- |
- |
00:20 |
12:35 |
3,5 |
|||||||
|
Sum |
860 |
- |
11:05 |
01:35 |
- |
- |
01:35 |
01:50 |
14:30 |
- |
260,4 |
||||||||||
Minimum |
15 |
- |
00:20 |
00:45 |
- |
- |
00:45 |
00:50 |
00:20 |
- |
3,5 |
|||||||||||
Maximum |
400 |
- |
04:30 |
00:50 |
- |
- |
00:50 |
01:00 |
06:00 |
- |
125 |
|||||||||||
Average |
172 |
- |
02:13 |
00:48 |
- |
- |
00:48 |
00:55 |
02:54 |
- |
52,1 |
|||||||||||
In 2020,
there were changes during the transport process. The times were extended: total work was
extended by 1 h 25 min, loading activities by 1 h 15 min, driving by 10 min and
pauses on the section by 10 min. The route was covered in two working
days. During the first day, three sections with a
length of 475 km were covered in 10 h 55 min, and on the second day, the
remaining two sections with a length of 385 km were driven in 6 h 45 min. As a result of the comparison to route no. 1 in
2019, it was observed that the travel time of sections 1-3 was extended by 1 h
25 min, while sections 4-5 were extended by 10 min. The extended
loading and unloading times were associated with longer vehicle operations and
the necessity to increase speed during transport, as a result of which, the
fuel consumption on the route increased by 19 liters, and the average fuel
consumption on the route section grew by 3.8 liters (Table 3).
Tab. 3
Source data for route no. 1 in 2020
ROUTE: STARE
ŻUKOWICE - PUSTKÓW OSIEDLE - WROCŁAW - OLEŚNICA -
TARNÓW - STARE ŻUKOWICE |
||||||||||||||||||||||
Route number |
Section |
Route of section |
Place of departure |
Date of departure |
Hour of departure |
Distance [km] |
Weight of load |
Driving time [h] |
Pause time |
Place of arrival |
Hour of arrival |
Time of |
Time of unloading |
Total working |
End of work |
Total fuel |
||||||
1 |
1 |
Stare Żukowice-
|
Stare |
01.03.2020 |
06:00 |
45 |
- |
00:40 |
- |
Pustków
Osiedle |
06:40 |
01:10 |
- |
01:50 |
- |
11,3 |
||||||
2 |
Pustków Osiedle-Wrocław |
Pustków Osiedle |
01.03.2020 |
07:50 |
400 |
20 |
05:00 |
01:00 |
Wrocław |
13:50 |
- |
01:15 |
06:15 |
- |
133,4 |
|||||||
3 |
Wrocław |
Wrocław |
01.03.2020 |
15:05 |
30 |
- |
00:40 |
- |
Oleśnica |
15:45 |
01:10 |
- |
01:50 |
16:55 |
7,5 |
|||||||
4 |
Oleśnica-Tarnów |
Oleśnica |
02.03.2020 |
06:00 |
370 |
24 |
04:30 |
00:45 |
Tarnów |
11:15 |
- |
01:05 |
05:35 |
- |
123,4 |
|||||||
5 |
Tarnów- |
Tarnów |
02.03.2020 |
12:20 |
15 |
- |
00:25 |
- |
Stare |
12:45 |
- |
- |
00:25 |
12:45 |
3,8 |
|||||||
|
Sum |
860 |
- |
11:15 |
01:45 |
- |
- |
02:20 |
02:20 |
15:55 |
- |
279,4 |
||||||||||
Minimum |
15 |
- |
00:25 |
00:45 |
- |
- |
01:10 |
01:05 |
00:25 |
- |
3,8 |
|||||||||||
Maximum |
400 |
- |
04:30 |
01:00 |
- |
- |
01:10 |
01:15 |
06:15 |
- |
133,4 |
|||||||||||
Average |
172 |
- |
01:53 |
00:53 |
- |
- |
01:10 |
01:10 |
03:11 |
- |
55,9 |
|||||||||||
In 2019, route no. 2 with a length
of 1015 km was covered in 16 h 10 min. The total
transport time included: driving 13 h 35 min, pause while driving 1 h 45 min,
and loading activities 2 h 35 min. The route was
covered in 2 days; on the first day, 510 km were covered in 9 h 20 min. The
remaining two sections with a length of 505 km were covered in 9 h 5min the
next day. During transport, the total fuel consumption
was 321.5l and the average consumption on the route section was 64.3l (Table
4).
Due to
the analysis of route no. 2 in 2020, there was an improvement in the total time
needed to cover the route. The total working time on the route was 15 h 35 min. This progression proceeds from the reduction of driving
time on sections no. 2 and 4 by 35 minutes and more efficient loading
activities by 5 minutes. The time improvement negatively affected
fuel consumption of 22.4 l on the entire route, which resulted from the
increased speed during the transport with a load (Table 5).
From the
study of route no. 3, it was observed that the route with a length of 450 km
was covered in 9 h 25 min. The total transport time included the
following times: driving - 6 h, loading activities 3 h 25 min. After
unloading, the required pause of 1 h 05 min was completed on the second
section. The remaining sections no. 3 and 4 were
completed in 3 h 30 min, and work was finished at 6:30 p.m. During transport, the total fuel consumption was 141.4 l,
and the average fuel consumption on the route section was 68.8 l (Table 6).
Based on
the analysis of route no. 3, it was noticed that the route was covered 10
minutes faster than in the previous year. The 450 km route was covered in 1 working day. The reduction of the time needed for loading activities by
25 minutes had a positive effect on the total working time, despite the
extended driving time of 15 minutes. There was a
major increase in the total fuel consumption on the route by 13.4 l and the
average fuel consumption on the section by 3.3 l (Table 7).
Tab. 4
Source data for route no. 2 in 2019
ROUTE: STARE
ŻUKOWICE - TARNÓW - SUCHA GÓRNA - LUBIN - DĘBICA -
STARE ŻUKOWICE |
|||||||||||||||||
Route number |
Section |
Route |
Place |
Date of departure
[day: month: year] |
Hour of departure
[hour: minute] |
Distance [km] |
Weight of |
Driving time [h] |
Pause time |
Place of arrival |
Hour of arrival |
Time of loading |
Time of |
Total working |
End of work |
Total fuel |
|
2 |
1 |
Stare Żukowice
-Tarnów |
Stare |
05.03.2019 |
06:00 |
15 |
- |
00:20 |
- |
Tarnów |
06:20 |
00:30 |
- |
00:50 |
- |
3,6 |
|
2 |
Tarnów- |
Tarnów |
05.03.2019 |
06:50 |
470 |
15 |
6:00 |
00:45 |
Sucha Górna |
13:35 |
- |
00:40 |
06:40 |
- |
151,6 |
|
|
3 |
Sucha Górna-Lubin |
Sucha Górna |
05.03.2019 |
14:15 |
25 |
- |
00:25 |
- |
Lubin |
14:40 |
00:40 |
- |
01:05 |
15:20 |
6 |
|
|
4 |
Lubin-Dębica |
Lubin |
06.03.2019 |
04:00 |
475 |
23 |
6:20 |
01:00 |
Dębica |
11:20 |
- |
00:45 |
07:05 |
- |
153,2 |
|
|
5 |
Dębica- |
Dębica |
06.03.2019 |
12:05 |
30 |
- |
00:30 |
- |
Stare |
12:35 |
- |
- |
00:30 |
13:05 |
7,1 |
|
|
|
Sum |
1015 |
- |
13:35 |
01:45 |
- |
- |
01:10 |
01:25 |
16:10 |
- |
321,5 |
|
||||
Minimum |
15 |
- |
00:20 |
00:45 |
- |
- |
00:30 |
00:40 |
00:30 |
- |
3,6 |
|
|||||
Maximum |
475 |
- |
04:30 |
01:00 |
- |
- |
00:40 |
00:45 |
07:05 |
- |
153,2 |
|
|||||
Average |
203 |
- |
01:56 |
00:53 |
- |
- |
00:35 |
00:43 |
03:14 |
- |
64,3 |
|
Tab. 5
Source data for route no. 2 in 2020
ROUTE: STARE ŻUKOWICE - TARNÓW
- SUCHA GÓRNA - LUBIN - DĘBICA - STARE ŻUKOWICE |
||||||||||||||||
Route number |
Section |
Route |
Place |
Date of departure
[day: month: year] |
Hour of departure
[hour: minute] |
Distance [km] |
Weight of |
Driving time [h] |
Pause time |
Place of arrival |
Hour of arrival
[hour: minute] |
Time of loading |
Time of |
Total working |
End of work |
Total fuel |
2 |
1 |
Stare
Żukowice-Tarnów |
Stare |
19.04.2020 |
06:00 |
15 |
- |
00:20 |
- |
Tarnów |
06:20 |
00:30 |
- |
00:50 |
- |
3,8 |
2 |
Tarnów- |
Tarnów |
19.04.2020 |
06:50 |
470 |
15 |
05:45 |
00:45 |
Sucha Górna |
13:20 |
- |
00:30 |
06:15 |
- |
162 |
|
3 |
Sucha Górna-Lubin |
Sucha Górna |
19.04.2020 |
13:50 |
25 |
- |
00:25 |
- |
Lubin |
14:15 |
00:50 |
- |
01:15 |
15:05 |
6,4 |
|
4 |
Lubin-Dębica |
Lubin |
20.04.2020 |
04:00 |
475 |
23 |
6:00 |
01:00 |
Dębica |
11:00 |
- |
00:45 |
06:45 |
- |
164 |
|
5 |
Dębica- |
Dębica |
20.04.2020 |
11:45 |
30 |
- |
00:30 |
- |
Stare Żukowice |
12:15 |
- |
- |
00:30 |
12:15 |
7,7 |
|
|
Sum |
1015 |
- |
13:00 |
01:45 |
- |
- |
01:20 |
01:15 |
15:35 |
- |
343,9 |
||||
Minimum |
15 |
- |
00:20 |
00:45 |
- |
- |
00:30 |
00:30 |
00:30 |
- |
3,8 |
|||||
Maximum |
475 |
- |
04:30 |
01:00 |
- |
- |
00:50 |
00:45 |
06:45 |
- |
164 |
|||||
Average |
203 |
- |
01:52 |
00:53 |
- |
- |
00:40 |
00:38 |
03:07 |
- |
68,8 |
Tab. 6
Source data for route no. 3 in 2019
ROUTE: STARE ŻUKOWICE - DĘBICA -
KŁODNICA - TARNÓW - STARE ŻUKOWICE |
||||||||||||||||
Route number |
Section |
Route |
Place |
Date of departure
[day: month: year] |
Hour of departure
[hour: minute] |
Distance [km] |
Weight of |
Driving time [h] |
Pause time |
Place of arrival |
Hour of arrival
[hour: minute] |
Time of loading |
Time of |
Total working |
End of work [hour:
minute] |
Total fuel
consumption [l] |
3 |
1 |
Stare Żukowice |
Stare |
20.05.2019 |
08:00 |
45 |
- |
00:40 |
- |
Dębica |
08:40 |
00:50 |
- |
01:30 |
- |
11,3 |
2 |
Dębica- |
Dębica |
20.05.2019 |
09:30 |
210 |
20 |
02:50 |
- |
Kłodnica |
12:20 |
00:40 |
00:55 |
04:25 |
- |
70 |
|
3 |
Kłodnica- |
Kłodnica |
20.05.2019 |
15:00 |
180 |
18 |
02:15 |
- |
Tarnów |
17:15 |
- |
01:00 |
03:15 |
- |
56,3 |
|
4 |
Tarnów-Stare Żukowice |
Tarnów |
20.05.2019 |
18:15 |
15 |
- |
00:15 |
- |
Stare Żukowice |
18:30 |
- |
- |
00:15 |
18:30 |
3,8 |
|
|
Sum |
450 |
- |
06:00 |
- |
- |
- |
01:30 |
01:55 |
09:25 |
- |
141,4 |
||||
Minimum |
15 |
- |
00:15 |
- |
- |
- |
00:40 |
00:55 |
00:15 |
- |
3,8 |
|||||
Maximum |
210 |
- |
02:50 |
- |
- |
- |
00:50 |
00:55 |
04:25 |
- |
70 |
|||||
Average |
112,5 |
- |
01:30 |
- |
- |
- |
00:40 |
00:38 |
02:21 |
- |
35,4 |
Tab. 7
Source data for route no. 3 in 2020
ROUTE: STARE ŻUKOWICE –
DĘBICA – KŁODNICA – TARNÓW – STARE
ŻUKOWICE |
||||||||||||||||
Route number |
Section |
Route |
Place |
Date of departure
[day: month: year] |
Hour of departure
[hour: minute] |
Distance [km] |
Weight of |
Driving time [h] |
Pause time |
Place of arrival |
Hour of arrival |
Time of loading |
Time of |
Total working |
End of work [hour:
minute] |
Total fuel |
3 |
1 |
Stare Żukowice |
Stare |
24.03.2020 |
08:00 |
45 |
- |
00:40 |
- |
Dębica |
08:40 |
00:45 |
- |
01:25 |
- |
11 |
2 |
Dębica- |
Dębica |
24.03.2020 |
09:25 |
210 |
20 |
02:50 |
- |
Kłodnica |
12:15 |
00:50 |
00:45 |
04:25 |
- |
77,8 |
|
3 |
Kłodnica- |
Kłodnica |
24.03.2020 |
15:00 |
180 |
18 |
02:25 |
- |
Tarnów |
17:25 |
- |
00:40 |
03:05 |
- |
62 |
|
4 |
Tarnów-Stare Żukowice |
Tarnów |
24.03.2020 |
18:05 |
15 |
- |
00:20 |
- |
Stare Żukowice |
18:25 |
- |
- |
00:20 |
18:25 |
4 |
|
Sum |
450 |
- |
06:15 |
- |
- |
- |
01:35 |
01:25 |
09:15 |
- |
154,8 |
|||||
Minimum |
15 |
- |
00:20 |
- |
- |
- |
00:45 |
00:40 |
00:20 |
- |
4 |
|||||
Maximum |
210 |
- |
02:50 |
- |
- |
- |
00:50 |
00:45 |
04:25 |
- |
77,8 |
|||||
Average |
112,5 |
- |
01:34 |
- |
- |
- |
00:48 |
00:43 |
02:19 |
- |
38,7 |
4. RESULTS AND DISCUSSION
Based on the analysis of the
services provided in 2019-2020 at the company under study, the structure of the
share of regular contractors among the total number of services provided was
prepared. The data was analyzed to demonstrate the changes and their sources
(Figure 6).
In
January and February 2019, the share of regular business partners in the total
services provided was 38 and 40%, respectively. At the turn of February and March 2019, there
was a sharp increase in the share by 46%. The change
was caused by establishing cooperation with contractor no. 2, who became the
main recipient of transport services. From March to
June 2019, a downward trend continued; as a result, in June, the share of
regular business partners in total services provided was 40%, analogous to
February. In July 2019, there was an increase in
the share of regular contractors in the total number of services provided. This stemmed from the purchase of two new truck sets.
Progressive growth was recorded till the end of 2019. At the turn of January
and April 2020, there was a sharp decrease of 57%. April
was at the lowest level having 28%. The existing permanent business
partners – contractors no. 2 and 3 – limited the purchase of
transport services. The decrease was recorded because of a
reduced demand for external transport services and the activities of
contractors to prevent disruption of the continuity of their own fleet. In the following months,
there was an upward trend of up to 79% in August 2020. On the other hand, there was a sharp decline of 41% in
September, and the negative situation continued until the end of 2020. Similarly, in the first half of the year, there was a
decrease of 33% in December 2020; the value of the share of regular contractors
in the total number of services provided was 33%. The issue of the company
was poor customer diversification. To avoid sudden
fluctuations caused by economic shifts and external factors, the transport
company should expand its contractor base.
Based on the analysis carried out in
the aspect of the transport process on routes no. 1, 2 and 3 in 2019-2020,
Tables 8, 9, and 10 were prepared. There were
differences in the key areas of the transport process regarding total fuel
consumption, average fuel consumption, average speed during transport, total
driving time, and total working time in 2019-2020.
For route
no. 1, the transport performance was at the level of 16 880 tkm. The cargo transport ratio was 90%,
which proves that the vehicle traveled 770 km with load on the route of 860 km. In 2020, the total working time was extended by 1 h 25
min, that is, 9.8%, while the following increased: total fuel consumption by
7.1%, average fuel consumption with load by 12.1%, and empty fuel consumption
by 7.1% (Table 8).
Regarding route no. 2, it was noted
that the cargo transport ratio was 93%. Transport with
cargo was performed on a distance of 945 km, which translates into transport
performance at the level of 17 975 tkm. In 2020, there were changes compared to
the previous year. The differences illustrated a reduction of
total working time of 3.6%, composed of driving time and loading activities. The
reduction in the time needed for transport was caused by an increase in the
average speed by 3.4 km/h. Consequently,
there was an increase in total fuel consumption by 7%, average fuel consumption
with load by 6.9% and empty fuel consumption
by 7% (Table 9).
Tab. 8
Results of analysis of route 1
|
ROUTE: STARE
ŻUKOWICE - PUSTKÓW OSIEDLE - WROCŁAW - OLEŚNICA -
TARNÓW - STARE ŻUKOWICE |
||||||||||||||||
|
Route number |
Section |
Distance [km] |
Carriage with |
Empty transport |
Weight of |
Transport work |
Freight factor |
Fuel |
Average fuel
consumption |
Average empty |
Average fuel
consumption with |
Driving time [h] |
Time of work [h] |
Average speed |
Average speed |
Average speed |
2019 |
1 |
1 |
45 |
0 |
45 |
- |
0 |
90 |
9,30 |
30,28 |
20,67 |
- |
00:40 |
01:30 |
77,4 |
79,6 |
63,4 |
2 |
400 |
400 |
0 |
20 |
8000 |
125,00 |
- |
31,25 |
05:00 |
06:00 |
|||||||
3 |
30 |
0 |
30 |
- |
0 |
7,00 |
23,33 |
- |
00:25 |
01:10 |
|||||||
4 |
370 |
370 |
0 |
24 |
8880 |
115,60 |
- |
31,24 |
04:40 |
05:30 |
|||||||
5 |
15 |
0 |
15 |
- |
0 |
3,50 |
23,33 |
- |
00:20 |
00:20 |
|||||||
Sum |
860 |
770 |
90 |
- |
16880 |
260,40 |
22,4 |
31,2 |
11:05 |
14:30 |
|||||||
2020 |
1 |
1 |
45 |
0 |
45 |
- |
0 |
90 |
11,30 |
32,49 |
25,11 |
- |
00:40 |
01:50 |
76,2 |
81,1 |
51,4 |
2 |
400 |
400 |
0 |
20 |
8000 |
133,40 |
- |
33,35 |
05:00 |
06:15 |
|||||||
3 |
30 |
0 |
30 |
- |
0 |
7,50 |
25,00 |
- |
00:40 |
01:50 |
|||||||
4 |
370 |
370 |
0 |
24 |
8880 |
123,40 |
- |
33,35 |
04:30 |
05:35 |
|||||||
5 |
15 |
0 |
15 |
- |
0 |
3,80 |
25,33 |
- |
00:25 |
00:25 |
|||||||
Sum |
860 |
770 |
90 |
- |
16880 |
279,40 |
25,1 |
33,4 |
11:15 |
15:55 |
Tab. 9
Results of analysis of route 2
|
ROUTE: STARE
ŻUKOWICE - TARNÓW - SUCHA GÓRNA - LUBIN - DĘBICA -
STARE ŻUKOWICE |
||||||||||||||||
|
Route number |
Section |
Distance [km] |
Carriage with |
Empty transport |
Weight of |
Transport work |
Freight factor |
Fuel |
Average fuel |
Average empty |
Average fuel |
Driving time [h] |
Time of work [h] |
Average speed |
Average speed |
Average speed |
2019 |
2 |
1 |
15 |
- |
15 |
- |
0 |
93 |
3,60 |
31,67 |
24,00 |
- |
00:20 |
00:50 |
74,7 |
76,6 |
56 |
2 |
470 |
470 |
- |
15 |
7050 |
151,60 |
- |
32,26 |
06:00 |
06:40 |
|||||||
3 |
25 |
- |
25 |
- |
0 |
6,00 |
24,00 |
- |
00:25 |
01:05 |
|||||||
4 |
475 |
475 |
- |
23 |
10925 |
153,20 |
- |
32,25 |
06:20 |
07:05 |
|||||||
5 |
30 |
- |
30 |
- |
0 |
7,10 |
23,67 |
- |
00:30 |
00:30 |
|||||||
Sum |
1015 |
945 |
70 |
- |
17975 |
321,50 |
23,89 |
32,25 |
13:35 |
16:10 |
|||||||
2020 |
2 |
1 |
15 |
- |
15 |
- |
0 |
93 |
3,80 |
33,88 |
25,33 |
- |
00:20 |
00:50 |
78,1 |
80,4 |
56 |
2 |
470 |
470 |
- |
15 |
7050 |
162,00 |
- |
34,47 |
05:45 |
06:15 |
|||||||
3 |
25 |
- |
25 |
- |
0 |
6,40 |
25,60 |
- |
00:25 |
01:15 |
|||||||
4 |
475 |
475 |
- |
23 |
10925 |
164,00 |
- |
34,53 |
06:00 |
06:45 |
|||||||
5 |
30 |
- |
30 |
- |
0 |
7,70 |
25,67 |
- |
00:30 |
00:30 |
|||||||
Sum |
1015 |
945 |
70 |
- |
17975 |
343,90 |
25,53 |
34,50 |
13:00 |
15:35 |
Following
the analysis of route no. 3, it was observed that the cargo transport ratio was
87%. This proves that transport work was
performed at the level of 7 440 tkm on the section with a length of 390 km. In 2019, the driving time was 6
hours, while the total working time was 9 hours 25 minutes. On the other hand, in 2020, there was a decrease in the
total working time by 1.8% and an extension of driving time by 4.1%. Hence, the total fuel consumption increased by 9.5%, the
average fuel consumption with a load by 1.3%, and empty fuel consumption by
10.6% (Table 10).
Tab. 10
Results of analysis of route 3
|
ROUTE: STARE ŻUKOWICE - DĘBICA - KŁODNICA -
TARNÓW - STARE ŻUKOWICE |
||||||||||||||||
|
Route number |
Section |
Distance [km] |
Carriage with |
Empty transport |
Weight of |
Transport work |
Freight factor |
Fuel |
Average fuel |
Average empty |
Average fuel consumption with |
Driving time [h] |
Time of work [h] |
Average speed |
Average speed |
Average speed |
2019 |
3 |
1 |
45 |
- |
45 |
- |
0 |
87 |
11,30 |
31,42 |
25,11 |
- |
00:40 |
01:30 |
75,0 |
76,7 |
65,5 |
2 |
210 |
210 |
- |
20 |
4200 |
70,00 |
- |
33,33 |
02:50 |
04:25 |
|||||||
3 |
180 |
180 |
- |
18 |
3240 |
56,30 |
- |
31,28 |
02:15 |
03:15 |
|||||||
4 |
15 |
- |
15 |
- |
0 |
3,80 |
25,33 |
- |
00:15 |
00:15 |
|||||||
Sum |
450 |
390 |
60 |
- |
7440 |
141,40 |
25,22 |
32,31 |
06:00 |
09:25 |
|||||||
2020 |
3 |
1 |
45 |
- |
45 |
- |
0 |
87 |
11,00 |
34,40 |
24,44 |
- |
00:40 |
01:25 |
72,0 |
74,3 |
60 |
2 |
210 |
210 |
- |
20 |
4200 |
77,80 |
- |
37,05 |
02:50 |
04:25 |
|||||||
3 |
180 |
180 |
- |
18 |
3240 |
62,00 |
- |
34,44 |
02:25 |
03:05 |
|||||||
4 |
15 |
- |
15 |
- |
0 |
4,00 |
26,67 |
- |
00:20 |
00:20 |
|||||||
Sum |
450 |
390 |
60 |
- |
7440 |
154,80 |
25,56 |
35,75 |
06:15 |
09:15 |
The
driving time and the total working time on the routes oscillated around the
base values from 2019. There was a substantial extension of the working time by 1 h 35 min on
route no. 1, which was the reason for the extension of loading and
unloading time by 1 h 15 min, driving time by 10 minutes, and pause while
driving by 10 minutes. The increase in the time necessary for loading
and unloading accelerated the process of cargo transport; at the same time,
affecting the amount of fuel consumed because, in 2020, the total fuel
consumption increased: on route no. 1 by 19 liters, on route no. 2 by 22.4
liters, on route no. 3 by 13.4 liters.
5. THE CONCEPT OF IMPROVING THE TRANSPORT PROCESSES CONDUCTED AT THE ENTERPRISE
Route no. 1:
- the first one on the
Pustków Osiedle – Wrocław route;
- the second one on the Oleśnica
– Tarnów route.
Route no. 2:
- the first one on the Tarnów
– Sucha Górna route;
- the second one on the Lubin
– Dębica route.
Route no. 3:
- the first one on the Dębica
– Kłodnica route;
- the second one on the
Kłodnica – Tarnów route.
In 2020, the number and type of loads carried on the given routes remained unchanged compared to 2019. Following this research, the authors observed that the loading and unloading times may be shortened. The extended period of handling activities negatively affects the transport time, speed during transport, fuel consumption, and the generation of additional transport-related costs. The proposed improvement concept will permit the minimization of the time of loading operations, which provides the possibility of taking additional orders by cutting down the total time of transport. The following indicators were used in this research [5]:
- transport time
where:
tjh – driving time on route h,
that is, when the vehicle is constantly in motion,
twh – waiting time for
operational activities, for example, stop at traffic lights, loading and
unloading.
- operating speed
where:
Lh – length of the road on line
h,
Tph – vehicle working time and
all accompanying activities [hour].
- vehicle performance
where:
Qh – transport work on route h,
which is the product of the load transported on a given route and the route
length.
Based on the source data of routes no. 1, 2 and 3, in the years
2019-2020, there was an improvement using the following indicators: transport
time, operational speed, and vehicle performance on the route (Table 11).
Tab. 11
Improvement of the implemented routes no. 1, 2
and 3 in 2019-2020
Route |
Year |
Time of transport |
Operational speed |
Vehicle performance |
1 |
2019 |
14:30 |
59,31 |
1164,14 |
2020 |
15:55 |
54,03 |
1060,52 |
|
2 |
2019 |
16:10 |
62,78 |
1111,80 |
2020 |
15:35 |
65,13 |
1153,20 |
|
3 |
2019 |
09:25 |
47,78 |
790,20 |
2020 |
09:15 |
48,65 |
804,60 |
In 2019,
the time of loading activities related to the first load from Pustków
Osiedle to Wrocław on route no. 1 was 1 h 50 min, while on route no. 2
from Oleśnica to Tarnów was 1 h 35 min. With the first load,
the time can be shortened by 10 minutes, and with the second load, the time can
be shortened by 5 minutes. The travel time of route no. 1 in 2020 was extended by 1 h 25 min; the
delay was caused by an increase in the time necessary for loading activities by
1 h 25 min. The increase
in transport time resulted in additional fuel consumption of 19 liters compared
to the previous year. Assuming the handling times from
2019, it is possible to shorten the loading and unloading process by 45 minutes
for the first load from Pustków Osiedle to Wrocław, while for the
second load from Oleśnica to Tarnów, 45 minutes can be gained.
In 2019,
the travel time of route no. 1 was 14 h 30 min. Because of the improvement, the loading time
will be reduced by 15 minutes, which will translate into an increase in:
operating speed by 1,04 km/h, vehicle performance by 20.26 tkm/h and the total
transport time, which will be shortened by 15 minutes, ultimately amounting to
14 hours 15 minutes. Due to the progression on route no. 1 in 2020,
the handling time of 4 h 40 min will be reduced by 1 h 30 min,
which will have a positive effect on the transport time, standing at 14 h 25
min. The reduced transport time will increase the
operational speed by 5.62 km/h, while the vehicle performance will record
progress at 110.08 tkm/h (Table 12).
Tab. 12
Improvement of route no. 1 in 2019-2020
Route |
Year |
Time of transport |
Operational speed |
Vehicle performance |
|
Before |
1 |
2019 |
14:30 |
59,31 |
1164,14 |
2020 |
15:55 |
54,03 |
1060,52 |
||
After |
2019 |
14:15 |
60,35 |
1184,40 |
|
2020 |
14:25 |
59,65 |
1170,60 |
In 2019,
the time needed to travel route no. 2 was a total of 16 h 10 min. Based on the improvement, the loading time will
be reduced by 10 minutes for the first load from Tarnów to Sucha
Górna, while for the second load from Lubin to Dębica, the time
will be shortened by 5 minutes. Improving the time of handling
operations on the route will have a positive effect on the total time of cargo
transport, reducing it by 15 minutes, which will translate into an increase in
the operating speed on the route by 0.99 km/h and an increase in vehicle
performance by 17.52 tkm/h. Considering the
improvement of route no. 2 in 2020, the loading time during the transport of
the second cargo from Lubin to Dębica, amounting to 1 h 35 min, will be
reduced to 1 h 20 min. Subsequently, there was a decrease in the time necessary to
transport the cargo by 15 minutes, which will increase the operational speed by
0.35 km/h and increase the vehicle performance by 6.48 tkm/h (Table 13).
Tab. 13
Improvement of route no. 2 in 2019-2020
Route |
Year |
Time of transport |
Operational speed |
Vehicle performance |
|
Before |
2 |
2019 |
16:10 |
62,78 |
1111,80 |
2020 |
15:35 |
65,13 |
1153,20 |
||
After |
2019 |
15:55 |
63,77 |
1129,32 |
|
2020 |
15:30 |
65,48 |
1159,68 |
In 2019,
the handling time on route no. 3 for the first load from Dębica to
Kłodnica was 1 h 45 min, while for the return cargo from
Kłodnica to Tarnów, the loading process time was 1 h 40 min. Due to the improvement, loading
times will be shortened – for the first load by 15 minutes, and the
second load by 20 minutes. In 2020, the loading and
unloading time during the transport of the first load to Kłodnica on route
no. 3 was 1 h 30 min; for return cargo, loading operations were performed
within 1 h 30 min. Because of the enhancement, the
time of loading processes during the transport of the second load will be
reduced by 10 minutes.
The travel time on route no. 3 in
2019 was 9 h 25 min. the
improvement of the transport process, the time of loading operations will be
reduced by 35 minutes. In effect, the total transport time will be reduced by
25 minutes, which will increase the operational speed of the vehicle on the
route by 2.22 km/h and increase the vehicle performance by 36.47 tkm/h. In 2020, route no. 3 was covered in 9 h 15 min. By
improving the route, the loading time will be reduced by 10 minutes. Accordingly, the total time of cargo transport will be 9 h
5 min, which will translate into an increase in operating speed by 0.89 km/h
and an increase in vehicle performance by 14.48 tkm/h (Table 14).
Tab. 14
Improvement of route no. 3 in 2019-2020
|
Route |
Year |
Time of transport |
Operational speed |
Vehicle performance |
Before |
3 |
2019 |
09:25 |
47,78 |
790,20 |
2020 |
09:15 |
48,65 |
804,60 |
||
After |
2019 |
09:00 |
50,00 |
826,67 |
|
2020 |
09:05 |
49,54 |
819,08 |
As a result of the improvement of the implemented processes, it is
possible to enhance the total time of cargo transport on all routes in the
years 2019-2020 at the studied transport company. In 2019, the reduction of loading times on
route no. 1 will improve the transport time by 1.72%. For route no. 1, in 2020,
the improvement will be at the level of 9.42%. Compared to the previous year,
this will lead to over five times greater progress. Due
to the reduction in handling times on route no. 2, in 2019 and 2020, the time
needed for cargo transportation will be shortened by 1.55 and 0.53%,
respectively. On the other hand, in terms of streamlining
the transport processes on route no. 3 in 2019-2020, it is possible to reduce
the transport time in 2019 by 25 minutes and in 2020 by 10 minutes. Reducing the time of handling
operations by 35 minutes will translate into an improvement in the time of
transporting loads by 4.42%. In 2020, the improvement of the transport
process by reducing the time of loading and unloading operations on route no. 3
will result in an enhancement of 1.80%. Summarily, the enhancement
of the cargo transport process by reducing the time of loading operations will
result in an improvement in the transport time on all routes, and consequently,
the company will be able to accept additional loads (Figure 7).
Fig. 7. Improvement of transport time on routes no. 1,
2 and 3 in 2019-2020
at the company [18]
Due to the
improvement of transport processes on routes no. 1, 2 and 3 in 2019-2020, it is
possible to shorten the times of loading operations. Hence, the operational speed of vehicles on the routes will increase. During the transport of cargo on route no. 1 in 2019,
before the progression, the operating speed was 59.31 km/h, and the reduction
in the time of handling operations will trigger progress by 1.75%, while in
2020, the increase will be 10.40%. Reducing the transport time by 15 minutes on route no. 2 in 2019 will
increase the operational speed of the vehicle on the route to 63.77 km/h. Given more
efficient loading operations on route no. 2, in 2020, the vehicle will increase
its speed by 0.53%. Because of the
improvement of the transport process, there was a positive effect on the
increase in the vehicle’s operational speed on route no. 3 in 2019 by
4.42%, and in 2020 by 1.83% (Figure 8).
Owing to
the improvement of transport processes carried out on routes no. 1, 2 and 3 at
the investigated company, it is possible to enhance the vehicle performance on
each of the tested routes. Due to more efficient loading operations on route no. 1, in 2019, the
vehicle performance will increase by 20.26 tkm/h, representing an increase of
1.74%. Regarding route no. 1, the most progression was recorded
in 2020, amounting to 10.38%. On route no. 2, the
vehicle realizing cargo transport will see an increase in productivity of 1.58%
in 2019, which will result from the opportunity to reduce transport times,
while in 2020, the performance will increase by 0.56%. The vehicle
performance on route no. 3 in 2019, amounting to 790.20 tkm/h, will increase by
reducing the time of loading operations. Because of the
progression, the vehicle performance will improve by 4.62%, while in 2020, it
will increase from 804.60 to 819.08tkm/h, representing an improvement of 1.80%
(Figure 9).
Fig. 8. Improvement of operational speed on routes no.
1, 2 and 3 in the years 2019-2020
at the company [18]
Fig. 9. Improvement of vehicle performance on routes
no. 1, 2 and 3 in the years 2019-2020
at the investigated company [18]
6. CONCLUSIONS
The
analysis of the recipients of transport services provided at the company under
review revealed considerable deviations in the share of regular contractors in
the total number of services provided at the turn of 2019 and 2020. The
percentage share of business partners recorded the largest drops in the wake of
December 2019 to April 2020 by 57% and from August to December 2020 by 46%.
Extensive fluctuations were caused by a sharp reduction in the purchase of
transport services by contractors no. 2 and 3. To avoid
similar situations in the future, it is recommended that the surveyed transport
company expands its contractor base. Based on this
research on transport processes on a real object, the following operational
parameters were analyzed: driving times, loading activities, pauses on
sections, fuel consumption, transport work performed, and vehicle speeds.
The analysis of the transport processes revealed that they can be improved. The improvement concept proposed by the authors allows for
the minimization of the time of loading operations on routes related to a
specific load. The loading times on routes no. 1, 2
and 3 in 2019-2020 will be reduced, namely cargo transport times will improve
from 0.53% to 9.42%, which will translate into an increase in the operational
speed of vehicles from 0.54 to 10.40% and an increase in vehicle performance
from 0.56 to 10.38%. In effect, the total time of transporting
cargo was reduced, which offers the possibility of accepting more orders.
References
1.
Bokor Z., R. Markovits-Somogyi.
2015. „Improved cost management at small and medium sized
road transport companies: case Hungary”. Promet-Traffic & Transportation 27(5): 417-428. DOI:
https://doi.org/10.7307/ptt.v27i5.1719.
2.
Pandelis D.G.,
C.C. Karamatsoukis, E.G. Kyriakidis. 2013. „Finite and infinite- horizon single vehicle routing problems with a
predefined customer sequence and pickup and delivery”. European Journal of Operational Research
231: 577-586. DOI: https://doi.org/10.1016/j.ejor.2013.05.050.
3.
Elbert R., D. Thiel,
D. Reinhardt. 2016. „Delivery Time Windows for Road Freight Carriers and
Forwarders - Influence of Delivery Time Windows on the Costs of Road Transport
Services”. Comercial Transport.
Book Series: Lecture Notes in Logistics:
255-274. DOI: https://doi.org/10.1007/978-3-319-21266-1_17.
4.
Jacyna M., M. Wasiak.
2015. „Costs of road transport depending on the type of
vehicles”. Combustion Engines
162(3): 85-90. ISSN: 2300-9896.
5.
Kauf
S., A. Tłuczak. 2016. Optymalizacja
decyzji logistycznych. [In Polish: Optimization of logistics decisions].
Difin. Warsaw. ISBN: 978-83-8085-258-7.
6.
Krajnc
J., K. Logožar, B. Korošec. 2012. „Activity- Based Management of Logistic Costs in a
Manufacturing Company: A Case of Increased Visibility of Logistic Costs in a
Slovenian Paper Manufacturing Company”. Promet-Traffic & Transportation 24(1): 15-24. DOI:
https://doi.org/10.7307/ptt.v24i1.265.
7.
Kot S. 2015. „Cost structure in relation to the size of road
transport enterprises”. Promet
-Traffic & Transportation 27(5): 387-394. DOI:
https://doi.org/10.7307/ptt.v27i5.1687.
8.
Ardakani
M.K., L. Sun. 2012. „Decremental algorithm for adaptive routing incorporating
traveler information”. Computers
& Operations Research 39: 3012-3020. DOI:
https://doi.org/10.1016/j.cor.2012.03.006.
9.
Ghannadpour S.F.,
S. Noori, R. Tavakkoli-Moghaddam, K. Ghoseiri. 2014. „A multi- objective dynamic vehicle routing problem with fuzzy time
windows: Model, solution and application”. Applied Soft Computing 14(C): 504-527. DOI: https://doi.org/10.1016/j.asoc.2013.08.015.
10.
Suzuki Y. 2012. „A decision support system of vehicle routing and
refueling for motor carriers with time-sensitive demands”. Decision Support Systems 54(1): 758-767.
DOI: https://doi.org/10.1016/j.dss.2012.09.004.
11.
Oliskevych M.
2019. „Dynamic scheduling of highway cargo
transportation”. In Proceedings of the 1st International
Scientific Conference ICCPT 2019 „Current
Problems of Transport”: 141-151. Ternopil, Ukraine, DOI: https://doi.org/10.5281/zenodo.3387524.
12.
Yang Z., J.P. van
Osta, B. van Veen, R. van Krevelen, R. van Klaveren, A. Stam, J. Kok, T. Bäck,
M. Emmerich. 2017. „Dynamic vehicle routing with time windows in theory
and practice”. Natural Computing
16(1): 119-134. DOI: https://doi.org/10.1007/s11047-016-9550-9.
13.
Caban J., P. Droździel,
L. Krzywonos, I. Rybicka, B. Šarkan, J. Vrábel. 2019. „Statistical analyses of selected maintenance
parameters of vehicle of road transport companies”. Advances in Science and Technology Research Journal 13(1): 1-13.
DOI: https://doi.org/10.12913/22998624/92106.
14.
Neumann T. 2017. „Fuzzy Routing Algorithm in Telematics Transportation
Systems”, Part of the Communications in Computer and Information Science.
Presented at the 17th
International Conference Transport Systems Telematics Conference TST 2017: Smart Solutions in Today’s Transport:
494-505. Springer International Publishing, Katowice‐Ustroń. DOI: https://doi.org/10.1007/978-3-319-66251-0_40.
15.
Simanová
Ľ., R. Stasiak-Betlejewska. 2019. „Monitoring and Improvement of Logistic Processes in
Enterprises of the Slovak Republic”. LOGI
– Scientific Journal on Transport and Logistics 10(1): 62-71. DOI:
https://doi.org/10.2478/logi-2019-0007.
16.
Pečený
L., P. Meško, R. Kampf, J. Gašparík. 2020. „Optimisation in Transport and Logistic
Processes”. Transportation Research
Procedia 44: 15-22. DOI: https://doi.org/10.1016/j.trpro.2020.02.003.
17.
Zubkov V. 2022. „Detailing the Impact Structure of the Participants of
the Complex Transport Service“. In: Conference proceedings: Technological Advancements in Construction,
Part of the Lecture Notes in Civil
Engineering book series, 180:
225-234. DOI: https://doi.org/10.1007/978-3-030-83917-8_21.
18.
Study of the chair
„Analysis and organization of
transport processes in the transport company Bar-Trans at the turn of 2019-2020”.
University of Information Technology and Management in Rzeszow, Rzeszów
2022.
19.
Liu Z., Y. Wu, T. Liu,
X. Wang, W. Li, Y. Yin, X. Xiao. 2021. „Double path optimization of transport of industrial hazardous waste
based on green supply chain management”. Sustainability 13(9)5215: 1-19. DOI: https://doi.org/10.3390/su13095215.
20.
Gharehgozli A., H.
de Vries, S. Decrauw. 2019. „The role of standardisation in European intermodal
transportation”. Maritime Business
Review
4(2): 151-168. ISSN: 2397-3757. DOI:
https://doi.org/10.1108/MABR-09-2018-0038.
21.
Kordel
Z. 2019. Polski transport samochodowy
ładunków. [In Polish: Polish road transport of cargo]. CeDeWu Sp.z o.o.
Warszawa. ISBN: 978-83-8102-283-5.
22.
Rybicka
I., P. Droździel, O. Stopka, V. Ľupták. 2018. „Methodology to propose a regional transport
organization within specific integrated transport system: A case study”. Transport Problems 13(4): 115-125. DOI:
10.20858/tp.2018.13.4.11.
23.
Kong Y., B. Tian,
Q. Wang, D. Liu, Y. Gao, C. Li, Y. Zhang. 2021. „Construction of the Optimization Model of Cargo Transport Network”.
7th International Conference
on Energy Materials and Environment Engineering ICEMEE 2021. E3S Web Conf.
No 03013(261): 1-4. DOI: https://doi.org/10.1051/e3sconf/202126103013.
24.
Memon M.A., A. Shaikh,
A. Sulaiman, A. Alghamdi, M. Alrizq, B. Archimède. 2021. „Time and quantity based hybrid consolidation
algorithms for reduced cost products delivery”. Computers, Materials and Continua 69(1): 409-432. DOI: https://doi.org/10.32604/cmc.2021.017653.
25.
Pasza J., M.A. Dulebenets,
M. Kavoosi, O.F. Abioye, H. Wang, W. Guo. 2020. „An Optimization Model and Solution Algorithms for the Vehicle
Routing Problem with a “Factory-in-a-Box” “. IEEE Access 8: 134743-134763. DOI: https://doi.org/10.1109/ACCESS.2020.3010176.
Received 15.10.2022; accepted in
revised form 17.12.2022
Scientific Journal of Silesian University of Technology. Series
Transport is licensed under a Creative Commons Attribution 4.0
International License
[1] Kazimierz Pulaski University of Technology and Humanities in Radom,
Faculty of Transport, Electrical Engineering and Computer Science, Malczewskiego 29, 26-600 Radom, Poland. Email:
z.lukasik@uthrad.pl. ORCID: https://orcid.org/0000-0002-7403-8760
[2] Kazimierz Pulaski University of Technology and Humanities in Radom,
Faculty of Transport, Electrical Engineering and Computer Science, Malczewskiego 29, 26-600 Radom, Poland. Email:
a.kusminska@uthrad.pl. ORCID: https://orcid.org/0000-0002-9466-1031
[3] University of Information
Technology and Management in Rzeszow, Chair of Logistics and Process
Engineering, Sucharskiego 2, 35-225 Rzeszow, Poland. Email:
solszanska@wsiz.rzeszow.pl. ORCID: https://orcid.org/0000-0002-0912-4726